COGNERIS — PROOF OF CONCEPT PLAN AND SCORECARD Blank template. Do not include customer documents, credentials or signed URLs. Plan: owner / date / environment / version / process / modules in scope / excluded modules: Customer responsibilities / Cogneris responsibilities / prerequisites and start date: Data authorization / synthetic fixture provenance / retention / disposal / isolation / cost limit: Baseline method for time, quality and cost / ground-truth reviewer / normalization: Configuration set (100) / blind set (400) / representativeness and exclusions: Freeze date / version / thresholds / sample sizes by module / risk and attack types: SCORECARD — duplicate per measure Module / mandatory? / field or scenario / version / environment: Measure and formula / numerator / denominator / exclusions / agreed target: Result / confidence interval where applicable / evidence reference / pass, fail or inconclusive: Review owner / date / restrictions: KICKOFF CHECKLIST [ ] Owners, scope, process, target and prerequisites agreed [ ] Environment, access, data authorization and disposal agreed [ ] Baseline and ground truth reviewed; samples separated [ ] Separate module-specific samples and limits agreed [ ] Configuration and thresholds frozen before blind evaluation CLOSEOUT CHECKLIST [ ] Record all cases, failures and unmeasured criteria [ ] Compare human time and total cost per correctly completed case [ ] Review privacy, isolation, audit and cleanup evidence [ ] Record decision: controlled pilot / limited scope / do not proceed / inconclusive [ ] Record restrictions, owners and next steps; revoke test credentials