An accounts payable team wants to classify and extract 2,000 one-page supplier documents during a pilot. Before agreeing to the target, the team needs to know how many credits that volume would use, what the credits above the allowance would cost, and which requests the cap would allow.
Convert volume and operations into credits
Count documents by page length and list what you will do with them. The Cogneris credit rate card lists this one-page example as 1.2 credits for classification plus 3 for extraction, or 4.2 credits per document. Use the documented operations and page counts for longer documents because each operation charges its base once. The Cogneris platform overview explains that operations draw from the same credit pool. Include any other work using that pool when you forecast the period.
For the fictional pilot below, assume that all 2,000 documents are one page, each goes through both operations, and the Pro subscription has no other usage during the billing period. The public Pro plan listed €99 per month, 5,000 included credits, and €0.03 per extra credit on .
Work out the projected overage
| Step | Calculation | Result |
|---|---|---|
| Convert volume to credits | 2,000 × (1.2 + 3) | 8,400 credits |
| Subtract the Pro allowance | 8,400 − 5,000 | 3,400 credits over the allowance |
| Price projected excess | 3,400 × €0.03 | €102 projected overage before the cap |
| Compare with the default cap | €102 − €100 | €2 above the cap |
At that volume, the base subscription and the projected overage would add up to €201 before applying the cap. With the default €100 cap, some planned usage would be refused. The €102 figure estimates the overage if all projected usage were accepted. Actual overage depends on the requests that run.
What happens when a request reaches the cap
The Cogneris release notes set the default monthly overage cap for Pro and Scale at 100 in the subscription currency, with an adjustable maximum of 10,000. A company admin can change it in the console. A request can bring the overage exactly to the cap. If a request would take it above the cap, Cogneris refuses that request with HTTP 402 and the reason BILLING_OVERAGE_CAP_REACHED.
For example, suppose the pilot has already accrued €99.96 of overage. A one-page extraction request costs 3 credits, or €0.09 at the published Pro overage rate. With the included credits already used, processing that request would bring overage to €100.05, so it would be refused. Cogneris notifies company admins by email when included credits or the overage cap reach 80% and 100%, once per threshold per period.
Use the forecast to plan the pilot
Put the document count, expected calls, included credits, overage rate, and cap next to the target volume. With the example's €2 gap, the team can plan for fewer documents within the current cap or have its company admin review a higher cap before the pilot starts. When a request is refused at the cap, the documented options are to raise the cap or wait for the next billing period.
This estimate covers the subscription and processing budget. A cost-per-successful-task calculation accounts for outcomes and retries. Use the AI ROI guide to compare wider business costs and benefits.