Plan a proof of concept
Agree on the process, evidence and decision before testing. This guide helps your team evaluate document AI and any additional modules in scope.
Before the clock starts
The baseline schedule is 10 business days after scope, access, data and owners are ready. Additional modules or unresolved prerequisites can extend it by agreement.
- Choose the process — cover intake, validation, review, integration and completion. Mark every module as required or out of scope.
- Set a baseline — measure current human time, cost and quality for a correctly completed case.
- Protect the data — agree authorization, environment, retention and disposal. Public examples and connected demonstrations use synthetic data only; representative tests using real data require a separate authorized protocol.
- Confirm feasibility — the customer supplies permitted samples, access and owners; Cogneris confirms the environment, integrations and prerequisites for the selected modules.
Use the current sandbox only for supported asynchronous IDP operations. Portal, face match, liveness and signature need an appropriately isolated environment and confirmed access; a simulation is not an end-to-end or biometric acceptance test.
Ten business days, once ready
| When | Joint work and deliverable |
|---|---|
| Before D1 | Customer provides approved sample, access and baseline; Cogneris confirms feasibility and isolation. |
| D1 | Agree process, modules, risk, samples, mandatory targets and owners; sign off the test plan. |
| D2–D3 | Prepare human-reviewed ground truth, configure the sample and minimum integration; customer supplies review expertise and Cogneris configures the environment. |
| D4 | Explore exceptions, verify instrumentation and freeze configuration, version and thresholds. |
| D5–D7 | Run blind evaluation and agreed journey, security and recovery scenarios; retain sanitized evidence. |
| D8–D9 | Cogneris consolidates results; both teams review quality, cost, limitations and failures. Corrections belong to a separate round. |
| D10 | Decide the next step by module; deliver report, restrictions and a cleanup plan. |
Design a fair IDP evaluation
For a representative evaluation, propose 500 authorized documents: 100 for configuration and 400 for blind evaluation, preferably across three representative types. Separate near-duplicates across sets; include unseen layouts, multipage tables, poor images, missing fields, duplicates and exceptions. The public demonstration uses synthetic samples only.
Have people review the ground truth and agree critical fields and normalization rules. Freeze configuration and confidence thresholds before the blind run. A change requires a new version and evaluation set.
| Measure | Definition and proposed target |
|---|---|
| Field accuracy | Correct field values ÷ evaluated values, by field and document type. Propose ≥99% per critical field and ≥97% for other required fields. |
| Automatic approval | Propose no critical error observed among automatically approved documents and ≤1% with any error. Precision = entirely correct auto-approved documents ÷ all auto-approved documents. |
| Correct automation | Entirely correct auto-approved documents ÷ all eligible documents evaluated. Include difficult exceptions; agree a target before testing. |
| Human time and cost | Compare total human time including review and correction; propose ≥60% reduction. Compare cost per correctly completed document including API, review and reprocessing; propose ≥30% reduction. |
Required validation failures go to review with a reason; missing fields must not be invented. Measure table and line-item quality, completeness, new-layout setup time and latency p50/p95; agree their limits before testing.
Measure each selected module
Choose separate samples for people, sessions, attempts and devices; the document sample size does not automatically apply. Record numerator, denominator, exclusions, version, environment and evidence for each measure. Show confidence intervals where applicable.
Liveness and face match, when applicable
Measure APCER by attack type and BPCER for legitimate users separately; for face match measure FMR and FNMR at a threshold fixed before evaluation. Agree risk-based limits and sample sizes before testing or the module cannot pass. Test printed photos and screen/video replay as appropriate to the threat model. Segment by device, browser, light and represented groups. Proposed usability targets: ≥95% legitimate-user completion within two attempts and p95 capture/response ≤30 seconds excluding user inactivity. Synthetic replay does not establish biometric performance or certification.
Portal
Track invitation sent and delivered, access, start, submission and completion; distinguish delivery failure from abandonment. Proposed target: ≥95% task completion among assisted-test participants who start, using standardized instructions. Measure real invitation conversion separately, p50/p95 time, upload and support errors by device and browser. Test expiry, reuse, access control, cross-tenant access, recovery and accessibility of critical steps; no unauthorized access observed is required in the tested cases.
Signature
Agree modality, authentication, signer order and expected evidence; do not assume universal legal validity. Proposed target: ≥95% completion with signers available; measure real conversion and signer waiting separately. Require verifiable evidence and an intact link between signers, events and signed version for 100% of completed documents. Test whether changes to a signed document are detected, multiple signers, refusal, expiry, cancellation, resend and retries without duplicate signatures; measure active signing time and evidence availability latency.
Integration, operations and security
Test timeout, retries, repeated webhooks and outages for silent loss and duplication. Measure technical success, recovered failures, p50/p95 and throughput at agreed load. Test tenant isolation, permissions, audit trail, retention and disposal; inspect logs for secrets or sensitive content. Two weeks do not demonstrate annual availability. Report end-to-end time and cost per correctly completed case.
Make the decision explicit
- Approve a controlled pilot — all mandatory criteria for in-scope modules pass, with evidence and human review of exceptions.
- Approve a limited scope — only document types and modules that passed are included, with restrictions recorded.
- Do not proceed yet — an observed access breach, integrity failure, critical auto-approved error, missed agreed biometric limit or missed minimum economy criterion blocks approval.
- Inconclusive — insufficient samples or an unmeasured mandatory criterion cannot become an implicit pass.
A PoC decision supports a monitored pilot, not unrestricted production use. A synthetic demonstration cannot establish performance on real customer data.
Start with a shared record
These blank templates contain no customer data. Agree the measurements and fill them with sanitized references, not documents, credentials or signed URLs.